5-28-17RESURFACING UPDATE
- Posted On May 28, 2017
- By Chris Ziegler
- In Featured
- 0
RECEIVED FROM BUFFALO TOWNSHIP 5/27/17
*IMPORTANT NOTICE*
“Tentative” Butler-Freeport Trail Repaving Schedule
(per Brad Jeannerat with JC Lee Construction as of 5/25/17)
JC Lee Construction will be closing the Butler-Freeport Trail from the bridge in Herman to Great Belt Road Tuesday, May 30th, 2017 to Wednesday, May 31st, 2017 (weather permitting) to start the repaving project. The “TRAIL CLOSED” signs will be posted at the bridge in Herman, Sheetz Drive and Great Belt Road on Monday, May 29th, 2017.
****”repaving”, is with crushed limestone not asphalt.****